Parquet laying
A floor that lies flat because the subfloor was right from the start.

We start under the floor: we measure moisture, level with compound where needed and prepare the subfloor before the first board goes down. Then we lay with a proper expansion gap at the walls so the wood can move with the seasons without lifting or gapping.
We lay solid parquet, engineered boards and laminate, as planks, herringbone or mosaic patterns. We tell you straight what suits the room, the traffic and your underfloor heating, including when the cheaper option is the right one.
- 01Moisture measurement and subfloor assessment
- 02Levelling compound where needed
- 03Laying: planks, herringbone, mosaic parquet
- 04Expansion gaps and wall detailing
- 05Skirting boards and thresholds fitted




